Impact on energy efficiency assessment: WEEK 2

Dec. 16, 2019
1 minutes

Impact on energy efficiency assessment: WEEK 2

The first dataset was published in 2009 by NASA’s Global Modelling and Assimilation Office (GMAO). It is based on a version of the GEOS-51 atmospheric data assimilation system that was frozen in 20082. Due to apparent limitations and deficiencies, production of the MERRA reanalysis dataset ended on February 29, 2016.

Incorporating the latest advances in atmospheric modeling and data assimilation, the MERRA-2 program was developed to replace the original MERRA product. The water cycle was a major consideration in the development of the first data assimilation system. Over time, use of the original water balance equation revealed inconsistencies in terms of mass conservation.

It was therefore necessary to develop a more reliable model. The MERRA-2 data assimilation system differs from its predecessor in that the data system includes many additional observations (mainly satellite data), as well as a preferred cubic-spherical grid, instead of the initial latitude-longitude grid. In addition, certain modifications have been made to the forecast model, as well as to the assimilation procedure.

Sources :

https://journals.ametsoc.org/doi/full/10.1175/JCLI-D-16-0758.1
https://gmao.gsfc.nasa.gov/reanalysis/MERRA/

By Perrine Bugeat – Asset Manager

Blog

The Latest Renewable Energy News

Handshaking by two women

Why will certifications become necessary in 2026?

Solar Panel with Blue sky

Grid Availability and Curtailment: The Hidden Drivers of Solar Asset Performance

Sun with ondulations in purple

Smart Coexistence: When Sheep, Solar, and AI Work Together

Team of people at a conference

Greensolver will be in Montpellier for Energaia – 10 of december

Battery energy storage open

What the Update to NFPA 855 Means for Energy Storage Safety ?

Battery energy storage open with cables

Tales of BESS #11 – Case study: Technical Due Diligence for BESS project: 17.75MW / 35.5MWh (FR) 

Battery energy storage contener

Tales of BESS #10 – Case study: Technical Due Diligence on two Greek BESS projects: Totaling 100MW / 200MWh (GRC) 

Solar farm with solar panels with grass

Safety Concerns in Single-Axis Tracker PV Plants: Risks and Mitigation Strategies

battery energy storage system with solar panels and wind turbines behind

Tales of BESS #9 – Case study: Technical Due Diligence on two Greek BESS projects: Totaling 200MW / 400MWh (GRC)

Resources and insights Impact on energy efficiency assessment: WEEK 2