Tales of BESS #9 - Case study: Technical Due Diligence on two Greek BESS projects: Totaling 200MW / 400MWh (GRC)

Sep. 23, 2025
1 minute

As the Lender Technical Advisor, Greensolver conducted Technical Due Diligence for two standalone BESS assets 100MW/200MWh in the context of the project’s financing.

The scope of the work covered:

  • Regulatory:
    • Review of grant requirements and tracking of its development
    • Application of evolving regulatory requirements to technical specifications and financial model
  • Technical:
    • Review of Narada’s BESS
    • Review of the permits and licenses
    • Site Assessment and Review of the proposed layout
    • Design review and capacity to operate on primary reserve markets
    • Contracts review (Supply Agreement, EPC, O&M, LTSA, and Aggregation)
    • Augmentation Strategy Evaluation
    • Review of grant compliance
  • Financial:
    • Review of the financial model, validating assumptions and proposing suitable parameters where required CAPEX, OPEX, budgets, revenues)
    • Review of grant compliance

Through the Greensolver’s audit of the project, the technical review resulted in:

  • Site layout and system design revision, ensuring regulatory and grant compliance
  • Financial Model parameters revision, reflecting realistic-world conditions and up-to-date market information.
Battery Energy Storage System
Written by Nikko Talplacido
Blog

The Latest Renewable Energy News

Handshaking by two women

Why will certifications become necessary in 2026?

Grid Availability and Curtailment: The Hidden Drivers of Solar Asset Performance

Smart Coexistence: When Sheep, Solar, and AI Work Together

Greensolver will be in Montpellier for Energaia – 10 of december

Battery energy storage open

What the Update to NFPA 855 Means for Energy Storage Safety ?

Battery energy storage open with cables

Tales of BESS #11 – Case study: Technical Due Diligence for BESS project: 17.75MW / 35.5MWh (FR) 

Battery energy storage contener

Tales of BESS #10 – Case study: Technical Due Diligence on two Greek BESS projects: Totaling 100MW / 200MWh (GRC) 

Solar farm with solar panels with grass

Safety Concerns in Single-Axis Tracker PV Plants: Risks and Mitigation Strategies

battery energy storage system with solar panels and wind turbines behind

Tales of BESS #8 – Case Study: Invoicing Statements control: 20MW / 20MWh (UK)

Resources and insights Tales of BESS #9 – Case study: Technical Due Diligence on two Greek BESS projects: Totaling 200MW / 400MWh (GRC)