As the Lender Technical Advisor, Greensolver conducted Technical Due Diligence for two standalone BESS assets 100MW/200MWh in the context of the project’s financing.

The scope of the work covered:

  • Regulatory:
    • Review of grant requirements and tracking of its development
    • Application of evolving regulatory requirements to technical specifications and financial model
  • Technical:
    • Review of Narada’s BESS
    • Review of the permits and licenses
    • Site Assessment and Review of the proposed layout
    • Design review and capacity to operate on primary reserve markets
    • Contracts review (Supply Agreement, EPC, O&M, LTSA, and Aggregation)
    • Augmentation Strategy Evaluation
    • Review of grant compliance
  • Financial:
    • Review of the financial model, validating assumptions and proposing suitable parameters where required CAPEX, OPEX, budgets, revenues)
    • Review of grant compliance

Through the Greensolver’s audit of the project, the technical review resulted in:

  • Site layout and system design revision, ensuring regulatory and grant compliance
  • Financial Model parameters revision, reflecting realistic-world conditions and up-to-date market information.
Written by Nikko Talplacido
Blog

The Latest Renewable Energy News

What the Update to NFPA 855 Means for Energy Storage Safety ?

BESS-Picture-Databyte

Tales of BESS #14 – SPECIAL – Co-Located Asset : PV + BESS – Impact on Budget forecast​

BESS-Picture-Databyte

Tales of BESS #13 – SPECIAL – Support a developer in structuring its BESS projects: standalone and hybrid​

BESS-Picture-Databyte

Tales of BESS #12 – SPECIAL – Strategic and Financial Overview of French storage market​

Tales of BESS #11 – Case study: Technical Due Diligence for BESS project: 17.75MW / 35.5MWh (FR) 

Tales of BESS #10 – Case study: Technical Due Diligence on two Greek BESS projects: Totaling 100MW / 200MWh (GRC) 

Solar-Picture-databyte

Safety Concerns in Single-Axis Tracker PV Plants: Risks and Mitigation Strategies

BESS-Picture-Databyte

Tales of BESS #8 – Case Study: Invoicing Statements control: 20MW / 20MWh (UK)

Adjustment mechanism: Turning a regulatory obligation into an opportunity

Home Resources and insights Tales of BESS #9 – Case study: Technical Due Diligence on two Greek BESS projects: Totaling 200MW / 400MWh (GRC)